MCE-D1 Automated Production Line Piece Drilling And Weighing Teaching Equipment Automatic Training System

MCE-D1 Automated Production Line Piece Drilling And Weighing Teaching Equipment Automatic Training System

MCE-D1 Automated Production Line Piece Drilling And Weighing Teaching Equipment Automatic Training System

Description

MCE-D1 Automated Production Line Piece Drilling And Weighing Teaching Equipment Automatic Training System

The MCE-D1 line includes several MCE mechatronic modules that simulates an industrial automated process. Piece drilling and weighing are managed and supported by two robot arms. The educational objective is to broaden the student’s knowledge in programming and testing an industrial manufacturing line.

WORKING CYCLE

The working cycle can be described as follows:

  1. The piece is expulsed from the distributor
  2. Robot arm no. 1 picks and handles the piece
  3. The piece is drilled
  4. Robot arm no. 2 picks and handles the drilled piece
  5. The piece is weighed
  6. The piece is picked and handled again by robot no. 2 and laidon the conveyor belt

SYSTEM FEATURES AND MANAGEMENT

For system operation a microprocessor module (not included) is essential to manage the resources described below:

System units I/O needed
Q.ty Mod. D.I. D.O. A.I. A.O.
1 MCE-500 6 2
1 MCE-600 4 4
1 MCE-700 1 2
1 MCE-730 1
2 NDIDA 2 2
TOT System 13 D.I. 10 D.O. 1 A.I.

Recommended control modules (not included):

  • No. 1 Arduino training panel mod. MPC-18 withprogramming and simulation software included (IDE format) or
  • No. 1 PLC training panel mod. PLC-V8

Connection to the other modules is carried out via 2 mm sockets.

Tot size: 2000 x 1000 x 900 mm (approx)

Tot weight: 23 kg

    Contact Us








    has been added to your cart:
    Checkout